Cardinality estimate — where it appears
Named by 4 essays across one field — each of them below, with the objects they name alongside it.
The estimate a plan rests on
A planner chooses between an index and a scan on how many rows it thinks will match, and the number it has is wrong by a factor. Guess sixty-four times too many on a narrow query and the scan it picks costs 13.5 times the index. Guess sixty-four times too few on a wide one and the index costs at most 4.01 times the scan — a ceiling that can be named before any query runs.
The join order is a guess
Three tables, two orders, and an estimate of the first intermediate result that assumes the join column is uniform. When the column is skewed the estimate is out by seventy-two times, and the plan chosen on it costs 1.49 times the better one — which sounds tolerable until the shared output is taken away, and the part of the cost the order actually decided turns out to be 43.9 times worse.
The skew a few counters cannot repair
A join order chosen on the textbook estimate costs 243.9 times the better order at a Zipf exponent of two, and two counters a side are enough to fix it. At an exponent of one half the estimate is out by less than a factor of two, the plan it picks costs 1.37 times the better one, and no number of counters up to 256 changes that. The easy case is the extreme one, and the reason the moderate one is hard is a series that stops converging at exactly one half.
What insurance against an estimate costs
A planner that trusts its row estimate expects to pay 1.057 times the better plan and risks 7.76. One that insures itself by halving its estimate before it decides expects 1.057 and risks 4.10 — the insurance is free. At a read ratio of sixteen the same insurance costs six per cent in expectation and makes the worst case worse. Whether a conservative planner is paying a sensible premium depends on two numbers the planner can measure and usually does not — its device's read ratio and the direction its own errors run.
Named alongside it
The objects these essays reach for when they reach for this one.
Block transferEstimatorQuery planRegretRelative errorIndependence assumptionCrossoverHeavy hitterJoinMisra–GriesSelectivityTrade off