Concept

Search frontier — where it appears

The set of vertices a traversal has reached and not yet expanded, whose container decides the order and whose size is the traversal's space. Its container decides the traversal order and its size is the traversal's space, so two traversals differing in one line differ in both.

Named by 10 essays across 3 fields — each of them below, with the objects they name alongside it.

10010³10³10⁴10⁵10⁶10⁷Vcounted workBreadth-firstDijkstra, binary heapDijkstra, all V queuedBellman–Ford, all passesV from 64 to 2048, sparse, fixed average degreework = scans + visits + relaxations + queue comparisons

Counting on a graph

An instrumented array counts comparisons, swaps, reads and writes, and none of those is what a graph algorithm spends its time on. Three new primitives are needed — an adjacency scanned, a vertex first reached, an edge relaxed — and once they exist, breadth-first and depth-first search turn out to be the same algorithm by every count kept on arrays.

graphs · Graph
adjacency scansrelaxationsqueue comparisonsvisitsBreadth-first14,336Dijkstra, all V queued2,118,656Dijkstra, binary heap56,973Bellman–Ford, all passes50,309,120Prim64,884Kruskal74,008V = 2048, E = 6,144, sparse, fixed average degreeevery segment counted exactly

The queue decides the class, and the pseudocode does not name it

Dijkstra's algorithm is eleven lines of pseudocode with a priority queue in the middle of them. Which queue is not stated, and it is the difference between 56,973 units of work and 2,118,656 on the same graph. Two of the three queues here also fail to fit the class they are famous for, in a regime each.

graphs · Graph
No estimate543 cells expanded · path 58Straight-line estimate325 cells expanded · path 58Estimate doubled71 cells expanded · path 64V = 900, E = 895, every edge costs onethe estimate is a function of the vertex, supplied by the caller

The precondition on a function the caller writes

Dijkstra expands 1,582 cells to find a path of 98 across a fifty-square grid. The same loop, with the straight-line distance to the goal added to each key, expands 405 and finds the same 98. The estimate has to be a function the caller supplies, and the guarantee holds only while that function never overestimates — a condition on somebody else's code, not on the graph.

graphs · Graph
cells expandedreads building the estimateNo estimate1,572 expanded · path 356Straight-line estimate1,550 expanded · path 356A*, landmarks252 expanded · path 356 · 6,328 reads to buildV = 2,500, steps cost one to nine, seed 20260910shortest path 356

An estimate borrowed from an easier problem

On a grid where every step costs one, the straight-line distance to the goal cuts a search from 543 cells to 325. On terrain where steps cost between one and nine it cuts 1,572 to 1,550, because it still believes every step costs one. Four exact distance tables, computed once, cut the same search to 252 — and cost 6,328 reads to build, so they pay for themselves on the fifth query.

graphs · Graph
stop where they meetextra path length42321stop when keys reach itextra path length110203040grid, by seedV = 900, 28% blocked, steps cost one to nine5 of 40 wrong under the meeting rule

Where two searches should stop

Search from both ends of a shortest-path query at once and the two frontiers meet somewhere in the middle, having expanded about two thirds of what one search would. Stop at the first vertex both searches have finished, and on five of forty weighted grids the path returned is longer than the shortest. The rule that is always right stops on a different condition, and on one of those grids it also stops sooner.

graphs · Graph
010010³10⁴interval extensions48.1%68.5%69.8%errors allowed · share removed belowno pruningpruned on D4,000 characters · m = 1669.8% removed at k = 3

The branch that cannot reach an answer

Seventy-two rank operations over the pattern remove 27,906 of the 39,957 interval extensions a bounded-error index walk performs — 70% of the tree, at a budget of three. The share grows with the budget, which is what a pruning has to do to be worth its cost.

bounds · Distance
atgaattcatgagtgacaag00000111111112222222errorsthe pattern, left to right · D belowleast errors neededD, the bound4 symbols · m = 2090 ranks · 2 resets

The errors the rest of the pattern needs

Read the pattern left to right in an index of the reversed text and count the points where the interval empties. That count is a lower bound on the errors any alignment of the prefix must contain, it costs 72 rank operations, and it removes 70% of a search tree.

text · Distance
steps cost one to ninesteps cost one01,0002,0003,000cells expanded, mean over the gridsA* from one endalways shortestalways shortesttwo-ended Dijkstraalways shortestalways shortesttwo A*, separate estimateswrong on 12always shortesttwo A*, stop on either keyalways shortestalways shortesttwo A*, averaged potentialalways shortestalways shortest40 grids a bar, 2,500 cellsestimate: straight-line cells

Two estimates that must agree

Run A* from both ends of a query at once, each search guided by its own straight-line estimate, and stop by the rule that is correct for two-ended Dijkstra. On 40 weighted grids it expands 1,002 cells on average and returns a longer path than the shortest on 12 of them. Give both searches one potential, half of one estimate minus half of the other, and the same rule is correct again — on all 40 grids, for 1,041 cells. Two estimates that measure different things cannot share a stopping rule until they are made to measure the same thing.

graphs · Graph
0200400600800cells expanded per query, meanno landmarks897four near the centre423four at random209farthest-first141the corners1268 maps × 150 queriesdots: each map's mean

Where the landmarks stand

Four tables of exact distances, each from a chosen cell, turn a straight-line estimate that barely helps on rough terrain into one that cuts a search by a factor of six. Averaged over 1,200 queries on eight maps, the same four tables expand 126 cells a query when their cells are the map's corners and 423 when they are near its centre. The standard choice, each landmark as far as possible from the ones before, expands 141 and loses to the corners on all eight maps. Moving four landmarks to the right places buys more than doubling their number.

graphs · Graph
0.000.250.500.751.0005001,0001,500by key60% forward70% forward80% forward90% forwardone-endedhow the expansions are sharedcells expandedseparate key ÷ route40 grids, 2,500 cellsdashed: how close the separate key got to firing

A stop that is correct and never sooner

A two-ended search can stop when the two frontiers' keys together reach the best route found, and it can also stop when either frontier's own estimate reaches it alone. Both rules are safe, so a search may use whichever fires first. On forty weighted grids the second never fires: at the moment the first one stops the search, the larger of the two own-keys stands at 64% of the route. The extra rule costs 60% more counted work and a second priority queue to find that out.

graphs · Graph

Named alongside it

The objects these essays reach for when they reach for this one.

Dijkstra's algorithmHeuristic searchShortest pathAdmissibilityLower boundBidirectional searchPotential functionPriority queueStopping ruleTrade offTriangle inequalityAdjacency

All concepts